Cementos El Yaqui SA de CV Hermosillo, Son., Mexico
1 January, 1988
PEMEX Villahermosa, Tabasco, Mexico
1 January, 1991

1991 – 1993

CEMENTOS MEXICANOS SA DE CV HUICHAPAN, HGO., MEXICO

  • Metallic Structures: 950 tons of supply, manufacture and assembly for the clay and shale warehouse roof; galleries for the transport of cement at a height of 45 m; galleries for the transport of raw materials; galleries for the transport of raw flour.
  • Sheet: 2,768 m2 .
  • Paint: Finish and primer 1,073 tons Includes sandblasting.
  • Handrails: 645 m.
  • Mechanical Assembly: 1,010 tons of Mechanical Equipment consisting of belt conveyors, pulleys, reducers, motors, primary crusher, secondary crusher, motion detectors, metal separator.
  • Pipelines and chutes: 123 tons.
  • Pipes: 690 m from 1 ”to 12” in diameter.
  • Disassembly and Assembly: 35 tons of metal structure for the roof of the project's materials warehouse.
  • Electrical Work: Lighting and land system in the project warehouse.
en_USEN