Works in the coke mill, warehouse and transportation areas; clinker storage and transportation; silo for storage of cement; homogenization silo; building for raw material hoppers; primary and secondary crushing; limestone and clay courtyards.
1,658 tons of supply, manufacture and assembly of metal structures up to heights of 82 m using all types of structural profiles.
556 tons of supply, manufacture and assembly of hoppers, ducts and chutes of various shapes, sizes and weights.
2,111 tons of mechanical equipment assembly consisting of: dust collectors, shrink loaders, valves, belt conveyors, metal plate conveyors, worm conveyors, lump breakers, gates, scales, ball mill, fans, samplers, dynamic separators, tanks for gases, dispensers, pumps, coolers.
1,857 m2 supply and installation of electroforged grating.
3,376 m of supply and installation of railings on platforms and stairs.
11,501 m2 supply and installation of acrylic and paint sheet on roofs, galleries and facades.