Cementos Guadalajara SA de CV
1 January, 1996
Cementos Bayano SA
1 January, 1998

1997 – 1999

CEMENTOS DIAMANTE DE IBAGUE SA

Project: Kiln No. 2

  • 1,280 tons of supply, manufacture and assembly of metallic structures for the clinker transport galleries; transport of additives; galleries for cement transport; structures for service racks; primary and secondary crushing building; supports for gas ducts; geodesic cover or schwedler dome; support structures for electro filters.
  • 340 tons of supply, manufacture and assembly of pipelines and chutes for various mechanical equipment.
  • 502 tons of assembly of mechanical equipment for feeding, grinding, transportation and storage of cement; Roller press; cement silo aeration system; bucket elevators; dust collectors; helical conveyors; valves; sliders; fans; reducers; engines; conveyor belts.
  • 2,280 m of pipes from 1 ”to 10” in diameter.
  • 910 m2  grid type ensa for platforms and stair landings.
  • 794 m of handrails for platforms and stairs.
  • 12,690 m2 sheet for the Schwedler dome roof, galleries and facades.
en_USEN