1,280 tons of supply, manufacture and assembly of metallic structures for the clinker transport galleries; transport of additives; galleries for cement transport; structures for service racks; primary and secondary crushing building; supports for gas ducts; geodesic cover or schwedler dome; support structures for electro filters.
340 tons of supply, manufacture and assembly of pipelines and chutes for various mechanical equipment.
502 tons of assembly of mechanical equipment for feeding, grinding, transportation and storage of cement; Roller press; cement silo aeration system; bucket elevators; dust collectors; helical conveyors; valves; sliders; fans; reducers; engines; conveyor belts.
2,280 m of pipes from 1 ”to 10” in diameter.
910 m2 grid type ensa for platforms and stair landings.
794 m of handrails for platforms and stairs.
12,690 m2 sheet for the Schwedler dome roof, galleries and facades.